These are the valves at the master bath shower.

The soffitt and fascia are painted


This is the primer on the soffitt and fascia

This is the plumbing at the water closet in the master bath.

This is the plumbing in the powder bath.

These are the painters finishing the soffitt at the dining.

The exterior doors are installed.

This is the blocking for the painting in the entry.

The framers installed the bead board today.

The arch was installed at the wineroom.

The AC's were installed yesterday. This is the AC over the hallway to the master bath.

This is the AC over the kitchen.