Mechanical and frame pictures from 9-15-09

These are the valves at the master bath shower.

The soffitt and fascia are painted


This is the primer on the soffitt and fascia

This is the plumbing at the water closet in the master bath.

This is the plumbing in the powder bath.

These are the painters finishing the soffitt at the dining.

The exterior doors are installed.

This is the blocking for the painting in the entry.

The framers installed the bead board today.

The arch was installed at the wineroom.

The AC's were installed yesterday. This is the AC over the hallway to the master bath.

This is the AC over the kitchen.

Wednesday, September 9, 2009

New frame pictures 9-9-09

Groin ceiling looking above the tub

Side view from the garage

Attic storage subfloor


Arch at the family room



Groin at the dining room


Groin at the dining


Arches in hallway


Arch at exercise

Tuesday, September 1, 2009

More framing pictures

The Tyvek and roof underlayment are installed.

View of the front of the house.



Two workers installing the Tyvek.


A view of the courtyard.


A view of the entry.


This is an interior view of the kitchen


This is a view of the family room

Frame pictures 9-1-09